Russian manufacturer
of instrumentation and control equipment
EN

8 (800) 777 18 50

Working hours

  • Monday
    09:00-18:00
  • Tuesday
    09:00-18:00
  • Wednesday
    09:00-18:00
  • Thursday
    09:00-18:00
  • Friday
    09:00-18:00
  • Saturday
    Closed
  • Sunday
    Closed
Survey sheets
Request a quote
  • Monday
    09:00-18:00
  • Tuesday
    09:00-18:00
  • Wednesday
    09:00-18:00
  • Thursday
    09:00-18:00
  • Friday
    09:00-18:00
  • Saturday
    Closed
  • Sunday
    Closed

8 (800) 777 18 50

EN
Request a quote

Principle of Installing Keller Level Sensors in Wells at Russian Railways Stations

Keller level sensors are used for monitoring and controlling the consumption of drinking and technical water at key railway stations in many regions of the Russian Federation.


Location of some wells on the territory of the Russian Federation,
equipped with comprehensive solutions for monitoring water levels in wells by Izmerkon LLC

The railway is an entire infrastructure, a technological complex that includes railway tracks and other structures, railway stations, power supply devices, communication networks, signaling, centralization and blocking systems, information complexes, traffic control systems, and other buildings (both underground and above ground), structures, facilities, devices, and equipment that ensure the functioning of this complex. This infrastructure is located on land for which the Railway is responsible.

Installation diagram:

1) Digital indicator Evco EVK-521

2) Output pipe

3) Piezometric tube

4) Keller level sensor PR-26Y with 4…20 mA output

5) Submersible pump

Free land plots along railway right-of-ways can be leased to individuals and legal entities for agricultural use, passenger services, cargo storage, loading and unloading areas, construction of rail-side warehouses, and other purposes.

In other words, the railway is a "state within a state." To ensure the fulfillment of all the above tasks, there are wells on the Railway lands for water supply, the water level of which needs to be measured and monitored, as in all other wells. This includes the use of KELLER level transmitters. The point is that if this well is on Railway land, the Railway is responsible for organizing and executing this task.

Связанные продукты

Send request

Request a callback

Information sent successfully

Благодарим за обращение.
Ваша заявка будет рассмотрена в рабочее время:
Пн-Пт с 9 до 18 по московскому времени.